Installer/Owner Responsibility:
Hardwood flooring is a beautiful product of nature with inherent variations in appearance. Burlington prefinished floors are manufactured with high quality standards and in accordance with accepted industry standards, which permit a defect tolerance not to exceed 5%. The defects may be of a manufacturing or natural type, and this 5% defect allowance is not valid under the Burlington warranty. It is the owner's and installer's responsibility for all products installed. Please note: Burlington pre-finished floors are not to be installed over in-floor radiant heat systems.
Prior to installation, the installer and/or owner of a Burlington floor assume responsibility for carefully inspect the flooring as to grade, manufacture, color and finish. The owner's responsibility also applies during his/her absence from the installation site. If a flooring board is not acceptable, do not install it and contact the seller immediately. Once a board has been nailed or glued down, it is deemed accepted by the installer and/or owner. The manufacturer denies any responsibility for judgment errors and/or for poor installation quality of its products. Burlington will not be responsible for any labor, installation and other associated costs.
Tools and Accessories Needed for Nail Down Installation:
Tools and Accessories Needed for Glue Down Installation:
Temperature, Humidity, Storage and Handling:
Hardwood is a living material which reacts to changes of relative humidity. It absorbs or releases humidity according to seasons. To allow for proper acclimation, the heating/air-condition system must be operational for least 14 days prior to installation and thereafter at a temperature of 65°- 75°F to reach desired humidity level. The relative humidity level at home should be controlled between 35% - 55% at all times prior, during and subsequent to installation. In summer, when humidity is high, hardwood absorbs the humidity in the air and expands. The expansion causes the strips/planks of wood to push against each other. The floor is cupped or "cupping". These variations can be minimized with proper ventilation and dehumidifying. On the other hand, in winter, the relative humidity level at home is much lower due to the usage of heating system. The lower humidity level results the wood releases its humidity and the strips/planks contract or shrink. It is then recommended to use a humidifier to minimize extreme shrinkage effects.
Hardwood flooring must be stored in a controlled environment within the above mentioned temperature and humidity. In order to meet minimum installation requirements for moisture content, materials should be delivered 72 hours prior to installation or as long as necessary for the hardwood flooring to acclimate. Acclimation within a closed carton may not be adequate due to lack of air movement. Handle and unload with care. Store the flooring in a dry place and provide air space under cartons. Do not unload or transport flooring during wet conditions (i.e. rain, sleet or snow) because the wood will absorb moisture, which will cause it to swell. The swelling of the wood will cause problems, because eventually the wood will shrink back to its normal moisture content, and the resultant shrinkage may produce gaps in the finished flooring.
Job Site Requirements:
The building must be completely closed in with all outside doors and windows in place. All "wet" work (such as concrete, masonry, framing members, drywall, paint, etc.) should be thoroughly dry. The wall coverings and painting should be completed before the installation of the hardwood flooring. In order to avoid damage caused by moisture, make sure basements and under-floor crawl space are dry and well ventilated. Plastering and concrete work must be completely dry with minimum of 90 days curing time. Freshly poured concrete slabs emit many gallons of moisture as water vapor, therefore no concrete should be poured after the flooring is installed. Exterior grading should be complete with surface drainage offering a minimum drop of 3" in 10' to direct flow of water away from the structure. All gutters and downspouts should be in place. Solid and bamboo flooring only can be installed on or above ground level with a plywood subfloor. Engineered flooring can be installed above grade, at grade and below grade level. Do not install hardwood flooring in bathrooms nor over in-floor radiant heat systems.
Crawl spaces must be a minimum of 24" from the ground to underside of joists. A ground cover of 6-8 mil polyethylene sheeting is essential as a vapor barrier with joints lapped six inches and taped. The crawl space should have perimeter venting equal to a minimum of 1.5% of the crawl space square footage. These vents should be properly located to foster cross ventilation. Where necessary, local regulations must be met. Crawl spaces must be dry and well ventilated. Use a moisture meter to check the plywood (subfloor) moisture content. Delay the installation if the moisture content of the plywood (sub-floor) exceeds 12%. Engineered flooring can be installed over a dry concrete subfloor. In order to test the moisture level of the concrete subfloor, tape 18" x 18" clear plastic sheeting to the floor in two spots, sealing all sides with moisture resistant tape. Leave in place for 48 hours and then remove. If after removing there is no condensation on the underside of the plastic sheeting, the concrete slab can be considered dry enough to install the engineered flooring. If there is moisture on the plastic sheeting, there is a problem and the flooring cannot be installed. A professionally installed moisture barrier would be required. Using the moisture meter, check the moisture content of the Burlington flooring to ensure that it is within the Burlington acceptable moisture range of 6% to 9%. The installer and/or owner have full responsibility for moisture testing the wood or concrete subfloor and the Burlington flooring prior to installation.
Required SubFloor Surfaces and Conditions:
Note: particle board or other similar type products are not suitable subfloors.
Subflooring must be clean, smooth and free of wax, paint, oil, sealers, adhesives, curing agents and other debris. Subflooring must be straight, flat and leveled. Sand high areas or joints. Flatten low spots with layers of builders felt, plywood or shims (not leveling compounds). Subflooring must be structurally sound. Nail or screw any loose areas that squeak. Replace any damaged, swollen or delaminated subflooring. Subflooring must be completely dry and meet with moisture content requirements. Subfloor preparation is a very critical step prior to the installation of your new floor. The hardwood and bamboo floor is only as good as what is underneath it. Laminated rosin paper or construction paper acts as a moisture retarder and may be used to reduce movement caused by changes in subfloor moisture. Therefore it may reduce cupping and warping. It may also reduce sound transfer, and to prevent noise caused by minor irregularities and debris.
General Instructions Prior to Installation:
Nail or Staple Down Installation Guidelines
Note : some squeaking and crackling of the floor is normal when using the nail or staple down method, and is not considered a defect.
Glue Down Installation Guidelines ( For Engineered Floors Only)
Complete the Installation: